1. Home
  2. Blog
  3. TV running order

Blog

How to read a TV running order

A newsroom running order looks like a spreadsheet written in code: A04, VO/SOT, 0:40, 18:03:45. Once you know what each column is for, it tells you exactly where the show stands.

SHORT ANSWER

A TV running order, called a rundown in most US newsrooms, is the timed list of every item in a programme, in the order it airs. Each row carries a page number, a slug, a format such as VO, VO/SOT or PKG, the talent, an estimated length and a back-time, which is the time of day the item must start for the show to end on its off-air time.

ON THIS PAGE
  1. What is a running order in TV?
  2. What does each column mean?
  3. What do VO, SOT and PKG mean?
  4. How are page numbers and blocks organised?
  5. What are back-times, and heavy or light?
  6. A 30-minute news running order, worked through
  7. Where does a running order stop being enough?
  8. Doing this in runofsho
  9. FAQ

What is a running order in TV?

A running order is the plan of the whole programme, in the order the items will go to air. The BBC's guide to who does what in a TV studio describes it as "the order the stories appear on the programme", usually with key details about each report, and says everyone involved gets a copy of the final version. The programme editor controls it, the production assistant times it, and the gallery and the floor work from it.

"Running order" is the usual British term. US newsrooms and textbooks say "rundown". Event crews say "run of show". They are the same kind of document, built for different rooms: a run of show for a conference is organised around speakers and stage changes, while a TV running order is organised around blocks between commercial breaks and a fixed off-air time.

What does each column mean?

Column names vary from station to station, but most running orders share the same core. These definitions follow Syracuse University's ENPS guide for student newscasts and Brian Champagne's open textbook Writing for Electronic Media.

Column What it holds Why the crew needs it
Page A block letter and an item number, such as B02 for the second item in the second block Keeps printed scripts, the prompter and the running order in the same order
Slug A short name for the story, such as COUNCIL BUDGET Lets everyone refer to an item in two words
Format Reader, VO, VO/SOT, PKG, live, tease, break Tells the director which sources are needed and the producer which items can be shortened
Talent Which presenter reads it, sometimes where they stand Tells cameras and audio who to open
Estimated length The time the producer gives the item The plan the show is timed against
Actual The length the software calculates from the written script Shows when a script has been written longer than its slot
Back-time The time of day the item must start for the show to end on time Tells the gallery, at a glance, whether the show is ahead or behind

Stations often add columns for graphics, camera, video source and editor notes. A story with several parts, such as an anchor introduction, a live reporter and a package, usually takes several rows, one per element.

What do VO, SOT and PKG mean?

The format column uses a short set of codes. These are the most common in US local news:

  • Reader. The presenter reads the story on camera with no video.
  • VO (voice-over). The presenter reads while video plays.
  • SOT (sound on tape). A recorded clip with its own sound, usually an interview soundbite. The name has outlived the tape.
  • VO/SOT. The presenter reads over video, then a soundbite plays.
  • PKG (package). A complete recorded report with the reporter's narration, interviews and pictures.
  • Live. A presenter, reporter or guest on camera in real time.

The codes matter for timing because they tell you which items can move. The Writing for Electronic Media textbook suggests VOs should run about 0:20 to 0:25 and VO/SOTs about 0:35 to 0:45, while a general daily package runs about 1:15 to 1:30. A package is fixed once it rolls. A reader can lose a sentence. A live shot can run as long as the reporter keeps talking, which is why live items are the ones the producer watches most closely.

How are page numbers and blocks organised?

The show is split into blocks, one for each stretch of airtime between commercial breaks. Blocks are lettered from A. According to Writing for Electronic Media, a 30-minute newscast usually ends at C or D, a 60-minute newscast at G or H, and page numbers start again at the beginning of each block.

The A block carries the most urgent news. Later blocks tend to hold weather, sport, lighter stories and a closing "kicker". Some newsrooms also keep a holding block at the end. In the Syracuse ENPS setup, items in the Z block are left out of the show timing, so producers can park a story there and bring it back if the show runs light.

What are back-times, and heavy or light?

A back-time is worked out from the bottom of the running order. Take the off-air time and subtract the length of every item still to come, including the current one. The result is the latest time of day that item can start and still let the show finish on time. The arithmetic is the same as for any event with a hard out; the back-timing and hard outs guide shows the method step by step.

If the total of all the estimated lengths is shorter than the airtime, the show is "light". If it is longer, it is "heavy". The textbook notes that most producers are comfortable going into a newscast 0:30 light, which leaves room for a live shot that runs long or a slow handover. When the show goes heavy, the usual fix is to "float" a story: drop it from the running order and the prompter, then tell the director and the presenters it has gone.

A 30-minute news running order, worked through

Here is a fictional local newscast that goes on air at 18:00:00 and must be off at 18:30:00. Its items add up to 29:30, so it starts 0:30 light. That is why the first back-time reads 18:00:30 rather than 18:00:00: the show could start half a minute late and still make its off-air time.

Page Slug Format Talent Est. Back-time
A01 OPEN/HEADLINES Live Both 0:45 18:00:30
A02 COUNCIL BUDGET Live/PKG Sam, reporter 2:30 18:01:15
A03 BUDGET REAX VO/SOT Sam 0:40 18:03:45
A04 BRIDGE CLOSURE VO Lee 0:25 18:04:25
A05 HOUSING PRICES PKG Lee 1:45 18:04:50
A06 HOSPITAL WAIT TIMES PKG Sam 2:00 18:06:35
A07 TEASE 1 VO Sam 0:15 18:08:35
A08 BREAK 1 Commercial 3:00 18:08:50
B01 MAIN WEATHER Live Weather 3:00 18:11:50
B02 SCHOOL LUNCH PKG Lee 1:30 18:14:50
B03 FOOD BANK VO/SOT Sam 0:40 18:16:20
B04 LIBRARY HOURS Reader Lee 0:20 18:17:00
B05 TEASE 2 VO Lee 0:15 18:17:20
B06 BREAK 2 Commercial 3:00 18:17:35
C01 SPORTS Live Sports 3:30 18:20:35
C02 HEALTH WATCH PKG Lee 1:50 18:24:05
C03 TEASE 3 VO Sam 0:15 18:25:55
C04 BREAK 3 Commercial 3:00 18:26:10
D01 ZOO KICKER VO Both 0:30 18:29:10
D02 GOODNIGHT Live Both 0:20 18:29:40

Now the live shot in A02 runs 3:10 instead of 2:30. A03 starts at 18:03:55, ten seconds after its back-time of 18:03:45. The show has gone from 0:30 light to 0:10 heavy, and nothing that is still to come was planned to absorb it.

The producer looks down the format column for the cheapest cut before the break. A05 and A06 are packages, fixed once they roll. A04, the 0:25 BRIDGE CLOSURE voice-over, can go without anyone on air noticing. The producer moves it to the Z block, tells the director and Lee, and the back-time of A03 becomes 18:04:10. A03 is now starting 0:15 ahead of its back-time, so the show is 0:15 light again with the whole B, C and D blocks to go.

Two habits make that decision quick. Compare the clock with the back-time of the item that is starting, not the one that is ending. And decide early which items are fixed and which can move, so a cut is a look down one column rather than a debate in the gallery.

Where does a running order stop being enough?

A running order tells the crew what happens and when. It does not tell an operator the exact moment to act. That is the director's or show caller's job, using standbys and go cues against the running order; see how to call a show for the language.

It also depends on the lengths being honest. A back-time built on a script that has not been written yet, or a package whose length is a guess, is only as good as that guess. The back-time column will show a problem quickly, but it cannot tell you which item to cut. That remains an editorial decision.

Doing this in runofsho

runofsho is run of show software rather than a newsroom system, but the timing model is the same. Build the programme as rows with your own columns for format, talent and each department, and group the rows into blocks with a target length. Hard starts fix a row to a clock time, such as the return from a break. A floating row keeps a standby story in the rundown without counting towards the running time, which is the Z block in a different form. During the show, the over/under in the header tells the gallery how heavy or light it is, and on Pro the prompter follows the live row. The live broadcast rundown template is a 30-minute studio show you can open in the free builder.

What runofsho does not do: it has no MOS support, so it does not drive playout servers or graphics systems from the rundown, and it does not replace ENPS or iNEWS for writing and filing scripts. The broadcast use case page sets out where it fits and where a newsroom system such as Cuez is the better choice.

FAQ

Is a running order the same as a rundown?

Yes. "Running order" is the common British term and "rundown" the common US one. Both mean the timed list of items in a programme, in the order they air.

What is a slug in a TV rundown?

A slug is the short name of a story, such as COUNCIL BUDGET. It identifies the item on the running order, the script and the video, so everyone can refer to it in a couple of words.

What does it mean when a show is heavy?

The estimated lengths of the items still to come add up to more time than the show has left. Something has to be shortened or dropped before the off-air time, usually by floating a story.

What does floating a story mean?

Taking it out of the timed running order without deleting it. In many newsrooms it moves to a holding block that is not counted in the show timing, so the producer can bring it back if the show runs light.

How is a back-time calculated?

Subtract the lengths of every remaining item, including the current one, from the off-air time. The result is the latest time of day that item can start for the show to end on time.

See it run before your next show.

Open the sample room, start a cue, add a minute and send a message. No account needed.

Try a sample room