What is a run of show?
The one document everyone on comms is looking at. Here is what it is, what goes in it and how it differs from an agenda, a rundown and a cue sheet.
A run of show is the minute-by-minute plan for a live event. It lists every segment in order with its start time, duration, who is on stage, and what audio, lighting, video and graphics do at that moment. The audience sees an agenda. The crew works from the run of show.
ON THIS PAGE
What a run of show is
A run of show (often shortened to ROS, and also called a rundown, show flow or running order) is the working document for the people who make a live event happen. It answers four questions for every moment of the show:
- What is happening?
- When does it start and how long does it last?
- Who is on stage or on camera?
- What does each department need to do?
An agenda tells the audience that the keynote is at 9:00. The run of show tells the crew that at 8:58:30 the house lights go to half, at 8:59 the walk-in music fades, at 9:00:00 the opening video rolls for 90 seconds, and that the presenter enters from stage left on the last frame.
What goes in a run of show
Most run of show documents use the same core columns. Add more only when a department asks for them.
| Column | What it holds | Why it matters |
|---|---|---|
| Cue or item number | 1, 2, 3 or 1.1, 1.2 | The show caller says the number on comms, so everyone finds the row quickly. |
| Start time | Clock time the segment begins | Calculated from the durations above it. Never typed by hand if you can avoid it. |
| Duration | Minutes and seconds | The only time value a person should edit. |
| Segment | What the audience sees | "Keynote: The Year Ahead", not "Dana". |
| Who | Presenter, host, performer | Tells the stage manager who to have in the wings. |
| Audio | Mics, playback, music | "HH2 + lav 4, walk-on sting". |
| Lighting | Looks and transitions | "Stage wash, house to half". |
| Video and graphics | Slides, lower thirds, playback | "Deck v7, title slide; roll VT2". |
| Camera | Shots, for IMAG or stream | "Cam 2 wide, Cam 1 lectern". |
| Notes | Anything else | Hard outs, sponsor reads, safety notes. |
A short example
This is the first ten minutes of a conference morning.
| Cue | Start | Duration | Segment | Who | Production |
|---|---|---|---|---|---|
| 1 | 08:30 | 30:00 | Doors and walk-in | AUD: walk-in playlist. GFX: holding slide. LX: house full. | |
| 2 | 09:00 | 01:30 | Opening video | VID: roll VT1. LX: house out. AUD: VT audio. | |
| 3 | 09:01 | 03:30 | Welcome | Host | AUD: HH1. LX: stage wash. GFX: host lower third. |
| 4 | 09:05 | 20:00 | Keynote | CEO | AUD: lav 2. GFX: keynote deck. CAM: 1 lectern, 2 wide. |
| 5 | 09:25 | 10:00 | Q&A | CEO, Host | AUD: HH1, HH3 audience. LX: house to half. |
Longer, ready-made versions are in the template library, including a full conference run of show.
Run of show vs agenda, rundown, cue sheet and call sheet
These terms overlap, and different parts of the industry use them differently.
| Document | Audience | Level of detail |
|---|---|---|
| Agenda | Attendees | Session titles and start times. |
| Run of show | Whole production team | Every segment with timing, people and department notes. Common in corporate and conference work. |
| Rundown | Whole production team | The same thing. The usual word in broadcast, news and sports. |
| Show flow | Producers and clients | Often a lighter run of show used for approval before technical detail is added. |
| Cue sheet | One department | Every cue for lighting, sound or video, often finer than the run of show. |
| Call sheet | Cast and crew | Who needs to be where and when, before the show: call times, locations, contacts. |
| Production schedule | Crew and vendors | Load-in, rehearsals, doors and load-out across the day or week. |
Who uses it
- The producer owns the content and decides what gets cut when time runs short.
- The show caller (or stage manager) runs the show from it, calling each cue.
- The technical director and department heads read their own columns.
- Presenters and clients usually get a simpler view: their own slot, when to arrive and how long they have.
That last point is why a single spreadsheet tends to strain. Different people need different slices of the same plan, and they need the current version.
How detailed it should be
Detailed enough that someone else could call the show if you lost your voice. In practice:
- A row for every change the audience would notice, and every change a department has to make.
- Durations to the nearest 30 seconds for speeches, to the second for video playback.
- Walk-ons, walk-offs, resets and transitions as their own rows when they take more than 15 seconds. They add up.
Common mistakes
- Typing start times by hand. When the keynote grows by five minutes, every time after it is wrong. Enter durations and let start times calculate. The free builder does this in the browser.
- No transitions. Ten speaker changes at 45 seconds each is seven and a half minutes that is not in the plan.
- One version per person. "ROS_final_v9_REAL.xlsx" on five laptops means five different shows.
- No hard out. If the room must be clear by 12:30, write it at the top and back-time from it. See back-timing and hard outs.
From document to live show
A run of show starts as a plan and becomes a live tool. During the show, the current row is highlighted, the time remaining counts down, and the difference between plan and reality (over or under) tells the producer whether to trim. Dedicated run of show software, including runofsho, connects that live state to stage timers and backstage screens so the plan and the clock are the same thing. For the manual version of that job, read how to call a show.
FAQ
What does run of show mean?
It means the planned order and timing of everything that happens during a live event, written for the production team. "Run" refers to the running order. The abbreviation is ROS.
Is a run of show the same as a rundown?
Yes, in practice. "Run of show" is more common in corporate events and conferences, and "rundown" in broadcast, news and sports. Both describe the timed running order with production notes.
What is the difference between a run of show and an agenda?
An agenda is for attendees and lists sessions and start times. A run of show is for the crew and adds durations, cue numbers, who is on stage and what each technical department does.
How long should a run of show be?
As long as the show needs. A 60-minute webinar might have 15 rows. A full conference day often has 60 to 120. If a department has to do something, it gets a row.
What format should a run of show be in?
A spreadsheet works for planning: one row per segment, one column per department. For the live show, a tool that calculates start times and highlights the current cue for everyone is safer than a static file.