Front timing
DEFINITION
Front timing works out when each segment will start by adding the durations forward from the show's start time. A row's front time is its planned start if everything before it runs to length.
Example
An event that opens at 19:00. Each start is the one above it plus the duration above it.
| Start (front time) | Duration | Segment |
|---|---|---|
| 19:00 | 0:05 | Walk-in music ends, voice of God |
| 19:05 | 0:08 | Host welcome |
| 19:13 | 0:20 | Keynote |
| 19:33 | 0:03 | Video |
| 19:36 | 0:25 | Panel |
| 20:01 | Planned end |
This is what most event run of shows show by default. If the keynote runs 4 minutes long, every front time below it moves 4 minutes later, and the planned end becomes 20:05.
When to use which
- Front times answer "when will the panel start?" They are what you give presenters, green room staff and caterers.
- Back times answer "when must the panel start to finish on time?" They matter when the end is a hard out.
Broadcast rundown tools usually show both; Rundown Creator's timing guide describes front time as the on-air time plus the estimated durations of the items before it.